ECO/8.2.0/Checklist: Difference between revisions
m (→Test) |
m (→Final test) |
||
| Line 87: | Line 87: | ||
Network upgrade on wp: ___ |
Network upgrade on wp: ___ |
||
Other testing (describe): |
Other testing (describe): |
||
Since announcement of the Signed Candidate: |
|||
One week of testing has elapsed: ___ |
|||
No untriaged bugs: ___ |
|||
No blocks:8.2.0 bugs: ___ |
|||
Release notes are approved: ___ |
|||
Sign-off for release: (date and QA lead signature) |
Sign-off for release: (date and QA lead signature) |
||
_____________________________________________________________ |
_____________________________________________________________ |
||
Revision as of 22:40, 10 September 2008
This page lists the sign-offs required to advance through the software release process. Consult that page for additional details on each step and sign-off.
Proposal/Review
This section should be completed by the Triage team.
ECO Name: ECO/8.2.0 ECO Target date: September, 2008 (slipped from August) ECO Champion: Michael Stone Proposal approved: (date and Triage team signature) March, 2008 --Michael Stone 22:16, 10 September 2008 (UTC)
Candidate build
This section should be completed by the build master.
Build number: ??? Packages added/changed/removed: (each package diff should have a trac # and/or rationale)
Test
This section should be completed by the QA lead.
Build tested:
Checklist
Specific issue testing: ___
1 hour smoke test: ___
Fresh install: ___
Upgrade testing: ___ List builds tested from:
Downgrade testing: ___ List builds tested to:
Tested on C2 and C3: ___
Tested on NiMH batteries: ___
Tested on en_US locale+keyboard: ___ * *'d keyboards and locales are release criteria.
es_* ___ * -- there are many Spanish and Arabic locales;
mn_MN ___ * however, we don't yet distinguish between them.
ht_HT ___ *
fr_RW ___ *
rw_RW ___ *
am_ET ___ *
ar_* ___
kh_CA ___
fa_AF ___
hi_HI ___
pt_BR ___
Tested on other keyboards: ___ List keyboards:
Open, WEP, and WPA APs tested: ___ List brands, if appropriate:
New hardware tested, if supported: ___
Field testing, if possible: ___
Documentation testing: ___
Release to signature/final test: (date and QA lead signature)
_____________________________________________________________
Additional comments, if any:
Signature
This section should be completed by the security team.
Build to be signed:
Keys to be used:
Security-critical components
olpcrd version (rpm -q olpcrd):
Signed off by/date: ________________________________________
Firmware/OFW version (/ofw/openprom/model; check against rpm -q bootfw):
Signed off by/date: ________________________________________
Firmware/EC version: (/ofw/ec-name):
Signed off by/date: ________________________________________
Kernel version: (uname -r):
Signed off by/date: ________________________________________
Signatures above certify that, to the best of your knowledge, the above components are at least as secure as other components signed with these keys.
This section should be completed by the build engineer.
Checklist Appropriate sign-offs present above: ___ Versions in build match those approved above: ___ QA lead sign-off under 'Test' above: ___ Packages in build match those expected: ___ Checklist sign-off: (date and build master signature) _____________________________________________________________
Final test
This section should be completed by the QA lead.
Build tested: Checklist 1 hour smoke test: ___ (catch signature process regressions) USB stick fresh install on wp laptop: ___ USB stick upgrade on wp laptop: ___ Network upgrade on wp: ___ Other testing (describe):
Since announcement of the Signed Candidate: One week of testing has elapsed: ___ No untriaged bugs: ___ No blocks:8.2.0 bugs: ___ Release notes are approved: ___
Sign-off for release: (date and QA lead signature) _____________________________________________________________
This section should be completed by the release team.
Approved build number: OS version: Firmware/OFW version: Firmware/EC version: Wireless firmware version: Champion sign off: (date and champion signature) _____________________________________________________________
Release team final sign off on USR: (date and release team signature) _____________________________________________________________
Given three signatures above, the USR build can be published as official.