OLPC UK/Pilots/London2009/Proposal/Infrastructure Plan

From OLPC
< OLPC UK‎ | Pilots/London2009‎ | Proposal
Revision as of 11:00, 17 June 2009 by 217.41.229.105 (talk) (New page: In conjunction with the pilot schools the deployment team, and in particular Peter Robinson, will be identifying all infrastucture / installation requirements for the September pilot.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

In conjunction with the pilot schools the deployment team, and in particular Peter Robinson, will be identifying all infrastucture / installation requirements for the September pilot.