Deployment Guide/planning deployment needs on an individual school basis

From OLPC
< Deployment Guide
Revision as of 12:30, 20 June 2010 by FGrose (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

VI. Pricing worksheet (per school)

item quantity unit price total cost
per child
laptops 1
solar panels
per classroom
power strips
spare power adapters
multi-battery charger
per school
XS server 1
active antennae
access points
cabling
power supply
physical security
connectivity
modem
dish/antennae/etc.
startup costs
installation
teacher preparation
shipping
recurring costs
laptops for new students
connectivity cost
energy costs
maintenance costs
periodic equipment refreshes


Next Section: Guide to imaging, activating, and registering laptops