Tests/Sugar Control Panel/Frame/Corner Activation: Difference between revisions

From OLPC
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Test case
{{Test case
|testcase_name=Corner Activation
|testcase_name=Corner Activation
|testcase_category=SugarControlPanel
|testcase_stream=Joyride
|testcase_subcategory=corner delay
|testcase_stream=joyride, 8.2, Any
|testcase_component=Sugar Control Panel - Frame
|testcase_component=Sugar Control Panel - Frame
|testcase_feature=Sugar Control Panel#Frame
|testcase_feature=Sugar Control Panel#Frame
Line 16: Line 18:
|testcase_comments=None.
|testcase_comments=None.
}}
}}
{{Test results begin}}
{{Test results
|testresult_release=Candidate
|testresult_stream=joyride
|testresult_build=2200
|testresult_passfail=Pass
|testresult_comments=None.
}}
{{Test results end}}

Latest revision as of 04:14, 15 September 2008

Test case: Short name::Corner Activation
How to report results

Stream ,|x|Build stream::x}}
Category Test category::SugarControlPanel Sub-category Test subcategory::corner delay
Component System component::Sugar Control Panel - Frame
Feature System feature::Sugar Control Panel#Frame
Objective Test objective::Verify that a user can change the delay before the frame appears when the cursor is moved into the corner of the screen.
Tools Test tools::No test tools required.
Setup Test setup::One XO laptop running an 8.2.0 (pre-)release build.
Procedure [[Test procedure::1. Open the graphical Sugar Control Panel from the Home view.

2. Click on the "Frame" panel.
3. Click and drag the knob on the "Corner" slider to set the delay.
4. Click the check-mark on the top-right. Select either "Later" or "Restart now".
4a. If you picked "Later", restart the laptop after a minute or two.
5. After the XO reboots, check that the delay changed by moving the mouse into one of the corners.
]]

Expected Results
and Pass Criteria
Pass criteria::The delay for the frame to open is changed to the value set in the control panel.
Comments More notes::None.
Release Stream Build Pass/Fail Trac Ticket(s) Comment(s) Date of Test
Software release::Candidate Build stream::joyride Build number::2200 PassFail::Pass ,|x| #x}} Comments::None. Created::