OLPC UK/Pilots/London2009/Proposal/Infrastructure Plan: Difference between revisions
< OLPC UK | Pilots/London2009 | Proposal
Jump to navigation
Jump to search
(New page: In conjunction with the pilot schools the deployment team, and in particular Peter Robinson, will be identifying all infrastucture / installation requirements for the September pilot.) |
(No difference)
|
Latest revision as of 11:00, 17 June 2009
In conjunction with the pilot schools the deployment team, and in particular Peter Robinson, will be identifying all infrastucture / installation requirements for the September pilot.