Deployment Guide/End of life planning: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<noinclude>{{Google Translations}}</noinclude> |
|||
⚫ | |||
==12. End of life planning== |
|||
⚫ | |||
ie, what do we do with the laptops when they begin to fail after 5 or more years. |
ie, what do we do with the laptops when they begin to fail after 5 or more years. |
||
Line 7: | Line 10: | ||
Local stripping down and recovery/recycling of valuable material should be considered. |
Local stripping down and recovery/recycling of valuable material should be considered. |
||
==Next Section: [[Deployment Guide/tips|Deployment tips]]== |
|||
[[Category:Documentation]] |
Latest revision as of 12:25, 20 June 2010
12. End of life planning
We are all conscious of the environment and any laptop rollout program should also include an "end of life" plan. ie, what do we do with the laptops when they begin to fail after 5 or more years.
Although the laptop is environmentally more friendly than any other laptop, we still do not want to see them filling up landfills or littering the streets.
Suggestions include a bounty for return or even a replacement laptop (assuming that by then, the laptop will cost only US $75)
Local stripping down and recovery/recycling of valuable material should be considered.