8.2.1: Difference between revisions

From OLPC
Jump to navigation Jump to search
No edit summary
 
(28 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{outdated}}
8.2.1 Planning and process page - Take 1 by [[User:Gregorio|Gregorio]] 21:03, 2 October 2008 (UTC)
== Release planning ==
Take 3 [[User:Gregorio|Gregorio]] 20:31, 24 December 2008 (UTC)


This release is targeted for Uruguay but it wil be available to everyone and probably will be used in manufacturing. It is a maintenance release based on [[8.2.0]]. As such it does not contain the latest changes and the goal is to minimize changes in order to bound the test cycle.
= Objective =
Improve stability over 8.2.0. 90% or more of the work should be bug fixes. Ensure smooth deployment for countries rolling out or upgrading between December and April.


== Standard information ==
= Date =
Must be posted by November 15. Any later and Rwanda will miss their opportunity to upgrade.


<small>These are all semantic annotations that other pages such as [[Releases]] can query.</small>
Change control must start by October 30.


Release notes: [[Release notes::Release notes/{{PAGENAME}}]]
Final regression test must start by November 7.
[[Category:Releases]]


Status: [[Status::released]]
= Target Customers =
- Peru <br>
School year starts in March but 9.1 wont be ready.


Target platforms: [[Target platforms::XO-1]]
- Uruguay ? <br>
Check when school year starts and what it will take for them to use this release.


Primary maintainer: [[Primary maintainer::User:Ed McNierney]]
- Rwanda <br>
School out as of October 31. Will have a window until December to upgrade


ECO: [[Is part of::ECO/8.2.1]]
- Haiti <br>
Deployment time frame on hold but should be ready by 8.2.1


Primary objective: [[Has objective::address critical bug fixes from release 8.2.0, mostly found in Uruguay]]
- Palestine <br>
Needs Arabic working


Lead customer: [[Lead customer:: OLPC Uruguay]]
- G1G1 <br>
Target factory imaging as of October 1. Target delivery in December.


Build number: [[Build number::802]]
- Any other target customers? Afghanistan, Mongolia, others.... <br>


Download URL: Download URL: [[Download URL::http://download.laptop.org/xo-1/os/official/802/]] , also [[Download URL::http://download.laptop.org/xo-1/custom/g1g1/gg-802-1/]] with [[G1G1 2008]] activities pre-installed.
= Rules of engagement =
We will collect the list of target bug fixes by reviewing open trac items and setting the ones we want to address to Milestone 8.2.1.


Firmware: [[Firmware::OLPC Firmware q2e41]]
Priority field will be set to High or Blocker. High bugs will be accepted until a certain date tbd. After that only blockers will be accepted.


Release date: [[release date::2009-05-13]]
Bug scrub decision criteria: <br>
If a bug will prevent a target customer from deploying it we will consider a high priority/blocker for the release. <br>


Build system: [[Build system::Pilgrim]] off [[Build platform::Fedora 9]]
On G1G1 if a bug will prevent a lot of support calls we will consider it. e.g. WPA improvements may be needed. <br>


Otherwise we will consider any bugs which have a High Value and Low effort or a High Value and High Effort as long as the ROI is clear and the bug can be addressed in the target time frame.

= Major Work to Consider =
We should decide if we want to have any focus on each of these. <br>

* Power
Could be a test only effort where QA must write and execute a full set of tests.

* Collaboration
Same as power. Don't plan on major re-work but improve test capacity. Additionally consider bug fixes which are well contained?

* Lease management
Critical customer issue. Need to decide if its in or out or if there is a minimal implementation we can do.

== Standard information ==
(These are all semantic annotations that other pages such as [[Releases]] can query.)

Release notes: [[Release notes/{{PAGENAME}}]]
[[Category:Releases]]
[[Category:Releases]]
<!-- above lines maybe could be a template -->

Status: [[status::nascent]]

Primary maintainer: [[Primary maintainer::User:CScott]]

ECO: not yet

Primary objective:
* [[Has objective::Enable deployments]]

Lead customer: [[Lead customer:: Rwanda]]

Build number and URL: [[Build number::nnn]

Schedule: [[target date::2008-11-15]]

Latest revision as of 07:46, 6 August 2013

The contents of this page are considered outdated and some of the information may be stale. Please use information here with caution, or update it.

Release planning

Take 3 Gregorio 20:31, 24 December 2008 (UTC)

This release is targeted for Uruguay but it wil be available to everyone and probably will be used in manufacturing. It is a maintenance release based on 8.2.0. As such it does not contain the latest changes and the goal is to minimize changes in order to bound the test cycle.

Standard information

These are all semantic annotations that other pages such as Releases can query.

Release notes: Release notes::Release notes/8.2.1

Status: Status::released

Target platforms: Target platforms::XO-1

Primary maintainer: Primary maintainer::User:Ed McNierney

ECO: Is part of::ECO/8.2.1

Primary objective: Has objective::address critical bug fixes from release 8.2.0, mostly found in Uruguay

Lead customer: Lead customer:: OLPC Uruguay

Build number: Build number::802

Download URL: Download URL: Download URL::http://download.laptop.org/xo-1/os/official/802/ , also Download URL::http://download.laptop.org/xo-1/custom/g1g1/gg-802-1/ with G1G1 2008 activities pre-installed.

Firmware: Firmware::OLPC Firmware q2e41

Release date: release date::2009-05-13

Build system: Build system::Pilgrim off Build platform::Fedora 9