User:Andreatl/ILXO budget: Difference between revisions
Jump to navigation
Jump to search
Line 27: | Line 27: | ||
== Project Expenses: Accessibility == |
== Project Expenses: Accessibility == |
||
=== Mandatory === |
|||
* $50 for physical hand braces, splints, restraints, earplugs, sunglasses |
|||
* $250 for books on assistive technology design (approximately 5-7 used books) |
|||
=== Would be nice === |
|||
* $200 for an electronics prototyping toolbench - nonconsumables like a soldering iron, breadboard, wire cutter, AVR programmer |
|||
* $200 for electronics prototyping supplies - consumables like solder, wire, microcontrollers, switches, buttons, lights, etc. |
|||
* $500 to print circuit boards for successfully prototyped designs in order to make these more widely available to the community for testing (we can always request/find this funding when we have successful designs) |
|||
== Project Expenses: Off-Grid Power == |
== Project Expenses: Off-Grid Power == |
Revision as of 14:35, 28 May 2008
Living Expenses (Boston)
- Transportation: $60 (cost of 4 MBTA weekly passes)
- Food ($150 per week) $600 total
- Rent ($200/person/wk) $2400 total
Total: $3060
Travel Expenses
- U-haul: $1000 + $300 for gas each way
- Gas: $150 each way (passenger vehicle)
- Tolls: ~$30 one way
- Lodging: $100 for 1 night
Total: $1580 each way
Living Expenses (Chicago)
- Food: $150 per week, $1500 total
- Gas/transportation: $400 (Assume $0.50/mile, ~8 miles to the office, 10 weeks)
Total: $1900
Office Expenses
Field Trip Expenses
Mobile Kit Expenses
Project Expenses: Accessibility
Mandatory
- $50 for physical hand braces, splints, restraints, earplugs, sunglasses
- $250 for books on assistive technology design (approximately 5-7 used books)
Would be nice
- $200 for an electronics prototyping toolbench - nonconsumables like a soldering iron, breadboard, wire cutter, AVR programmer
- $200 for electronics prototyping supplies - consumables like solder, wire, microcontrollers, switches, buttons, lights, etc.
- $500 to print circuit boards for successfully prototyped designs in order to make these more widely available to the community for testing (we can always request/find this funding when we have successful designs)
Project Expenses: Off-Grid Power
Extras
Salary/Stipend: $2500 per person
Total: $10,000