Power peripherals: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 13: | Line 13: | ||
== Possible Additional Deliverables == |
== Possible Additional Deliverables == |
||
*Exploratory report on additional ways to store charge |
|||
*Prototype and documentation of a simple bicycle generator |
|||
*Documentation on the possibility of using a thermoelectric generator |
|||
== To Do == |
== To Do == |
Revision as of 20:14, 6 June 2008
Milestones
By July 15
- Have voltage regulators with current limits to 1A, 1.5A, and 2A built with circuit diagrams and cost estimates
By July 22
- Draft deployment guide for establishing power infrastructure(calculating power requirements, needed equipment & projected costs)
By August 1
- Draft comprehensive guide to alternative power options
By August 8
- Final deployment guide for establishing power infrastructure
By August 15
- Final guide to alternative power options
- Charge several XO using a solar array at the Factor E Farm near Kansas City, MO and document ficndings
Possible Additional Deliverables
- Exploratory report on additional ways to store charge
- Prototype and documentation of a simple bicycle generator
- Documentation on the possibility of using a thermoelectric generator
To Do
June 13: Have a simple voltage regulator limited to 1A built for grassroots conference