====Before the official start ( May 10 - 26th )==== |
====Before the official start ( May 10 - 26th )==== |
||
⚫ | |||
* Talk to OLPC mentor, get tips on where to start, and revise spec |
|||
⚫ | |||
⚫ | |||
up close and personal |
|||
* Do the current API's meets the requirements for this project? If not |
|||
⚫ | |||
====Week #1 ( May 26th - May 30th )==== |
====Week #1 ( May 26th - May 30th )==== |
||
Line 91: | Line 87: | ||
====Week #2 ( June 2nd - June 6th )==== |
====Week #2 ( June 2nd - June 6th )==== |
||
* Create 13 more visualization prototypes |
|||
* Implement paper ( or photoshop ) prototype of the new design for |
|||
Groups and Neighborhoods |
|||
===Week #3 ( June 9th - 13th )=== |
===Week #3 ( June 9th - 13th )=== |
||
* Pick the best 10 out of the 15 prototypes |
|||
* Review paper prototype, by mentor, and anyone else at OLPC |
|||
* Run initial usability testing with mentor, and possible UVIC professors |
|||
* Create icon animation library |
|||
* Make changes and finalize paper prototype, update the spec |
|||
====Week #4 to #5 ( June 16th - July 4th )==== |
====Week #4 to #5 ( June 16th - July 4th )==== |
Revision as of 07:36, 16 April 2008
SYNOPSIS
Mesh Labs is a mesh visualization XO application and stand-alone Linux application that will provide alternative XO mesh visualizations. Intended for both developers and regular uses, Mesh Labs will provide 10 different views of the XO mesh network.
IMPLEMENTATION
XO Application
This XO application will use the following libraries:
1. SDL ( Simple Direct Media Library ) 2. sugar.* 3. possibly Cario
Linux Application
The Linux application we be ported directly, from the complete XO application.
VISUALIZATION IDEAS
Linear Jump Frog
This first visualization is called "Linear Jump Frog". I thought it would be interesting to rank all users according to their signal strength.
http://www.jwtanner.com/images/svg/line1.svg
Then I thought it would be fun, to have the different users hop over each other as their signal strength increases.
http://www.jwtanner.com/images/svg/line1.html
Planet Activity
This next visualization is called "Planet Activity". The goal was to create a mesh visualization similar tot the OLPC neighborhood, but with space-like theme.
http://www.jwtanner.com/images/svg/planet1.svg
In this picture, the planets represent activities, the more popular the activity, the bigger the planet. If a user has not joined a group activity, he/she sits on an asteroid.
Bump Line
This visualization is called "Bump Line". Similar to "Linear Jump", this visualization shows the level of connected-ness by the size of the bump the users icon sits on.
http://www.jwtanner.com/images/svg/bumpline1.svg
As the users more around closer or further away, each users bump, increases or decreases in real-time.
Ski Jump
This next visualization is called "Ski Jump". Pretty simple idea, all users connected on the mesh queue up and take turns going down the ski jump. The users signal strength will determine the jump height.
http://www.jwtanner.com/images/svg/ski1.svg
As you can see on the left the users mark their jump height after every jump.
http://www.jwtanner.com/images/svg/ski1.html
In this animation, a user has increased his signal strength and moved up the height rankings.
PROJECT SCHEDULE
Before the official start ( May 10 - 26th )
- Dive into the code for Sugar, Presence, Cario get to know the API's up close and personal
- Do the current API's meets the requirements for this project? If not propose creating new API methods to meet the requirements or revise spec
Week #1 ( May 26th - May 30th )
- Finalize spec with mentor
Week #2 ( June 2nd - June 6th )
- Create 13 more visualization prototypes
Week #3 ( June 9th - 13th )
- Pick the best 10 out of the 15 prototypes
- Create icon animation library
Week #4 to #5 ( June 16th - July 4th )
- Start implementing missing API methods if necessary
- Start creating working prototype ( eg all graphic elements in place,
but not all functionality )
Week #6 ( July 7th to July 11th )
- Revise working prototype based feedback from mentor, and other staff
members, update spec
Week #7 to #8 ( July 14th - July 25th )
- Implement fully functional prototype
Week #9 to #10 ( July 28th to August 1st )
- Run usability hallway testing with random people at UVIC
- Run usability hallway testing with group of children ( legality? )
Week #11 ( August 4th to August 8th )
- Does the fully functional prototype work as planned?
Week #12 - #13 ( August 25th to August 29th )
- Wrap up any final tests / last minute usability tests
- Does the final implementation pass security requirements?
- Add documentation to the wiki