Power peripherals: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 34: | Line 34: | ||
*Final Deployment guide (8/15) |
*Final Deployment guide (8/15) |
||
*Final solar testing data report (8/15) |
*Final solar testing data report (8/15) |
||
== Possible Additional Deliverables == |
|||
*Exploratory report on additional ways to store charge |
|||
*Prototype and documentation of a simple bicycle generator |
|||
*Documentation on the possibility of using a thermoelectric generator |
|||
== To Do == |
|||
June 13: Have a simple voltage regulator limited to 1A built for grassroots conference |
|||
[[Category: Battery & Power]] |
[[Category: Battery & Power]] |
Revision as of 16:35, 26 June 2008
Projects & Details
Voltage Regulator
- Develop basic voltage regulator that limits voltage and current to XO
- Redesign voltage regulator to produce variable outputs
- Redesign version 2 of regular to all it to charge multiple XOs
- Possible mechanical design of voltage regulator housing (need to evaluate later)
- Thermal analysis of regulator (need to evaluate later)
Bicycle Powered Generator
- Review of literature
- Development of bicycle powered generator design
- Building generator
Power Deployment Guide
- Summarize wiki information and commentary on OLPC mailing lists related to power
- Put information in easy-to-read guide on power deployment options
- Make guide widely available
Solar Setup Testing
- Develop testing methodologies for evaluating a XO solar setup
- Testing solar setup & publish findings
Thermoelectric Power Generation
- Explore potential for using thermoelectrics for powering XOs
Milestones
- Basic voltage regulator built (6/25- DONE)
- Variable voltage regulator built (7/7)
- Design of Bicycle Generator (7/15)
- Voltage regulator for charging multiple XOs (7/18)
- Revisit milestone schedule (7/18)
- Testing plan for solar testing (7/18)
- Acquire materials for bicycle generator (7/22)
- Draft Deployment Guide (7/25)
- Bicycle Generator built (7/31)
- Visit to Factor E Farm for testing solar setup and bicycle generator (8/1)
- Generator documentation (8/8)
- Final Deployment guide (8/15)
- Final solar testing data report (8/15)