Nepal:School Server Specification - Phase 1 Design
Nepal Deployment School Server Phase 1 Design Proposal
This deployment must be online for teacher training the first week of April.
See the full schedule at: http://wiki.laptop.org/go/Nepal:Pilot_Project_Plan
The previous design discussion is maintained for tracking phase 2 at: http://wiki.laptop.org/go/Nepal:School_Server_Specification
List of Hardware
- Four servers
- XS1
- XS2 - Standby backup only
- Squid1
- Squid 2
All boxes will have the following: - Intel or AMD at least 2 ghz - RAM? - At least 300gb hard drive - USB ports (how many?) - DVD or CD ROM drive - 3 x Active Antennas - 10/100 NIC? - Other wireless NIC?
- Wireless Access Point and Router
- Model name and number?
- Cables
- Enough Cat 5/6 with RJ45 connectors to connect servers to Wireless AP/Router - 5 Meter USB cable for each active antenna
- Power strip/circuit breakers
- How many?
- Hub?
List of Software on XS
- - -
XS Install Scripts
- - -
XS Tests
- - -
List of Software on Squid Box
- - -
Squid Box Install Scripts
- - -
Squid Box Tests
- - -
List of Software on Library Server
- - -
Library Server Install Scripts
- - -
Library Server Tests
- - -
List of Software on XO
- - -
XO Install Scripts
- - -
XO Tests
- - -
System Level Design
- - -
Failure Cases
- - -
System Level Tests
- - -
Wireless AP/Router Config
- - -
Network Diagram
- - -