TestMtg, July 16, 2007

From OLPC
Revision as of 08:11, 6 August 2013 by Quozl (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The contents of this page are considered outdated and some of the information may be stale. Please use information here with caution, or update it.

Minutes, 7/16/07

Attending: Cameron, Zack, Ed Russeau, John, Jim, Kim, Mary Lou

  • Requirements

There is now a requirements wiki page. We spent much of this meeting discussing the requirements for power management. The updated requirements can be found here: Requirements

  • We also created a chart of power management capabilities. This is linked on the requirements page.
  • We discussed some future features: Turn off wireless when it is not needed; Be able to turn on logging to expose DCON and Video state; bookmarks in browser. (I'll get these into the future features list).
  • We outlined the schedule, which is that Trial-2 should really be considered an alpha release for our first deployment. Kim will update the roadmap as the first step towards a schedule. Trial-2 is alpha, Trial-3 is beta, and FRS is first deployment, which is expected to be loaded by the deployment team when the laptops reach the country.
  • We could use a regression or smoke test. For now, I will propose that each build (before announcing it as a RC) will have some release notes and will be able to perform these basic tests:
  1. boot into sugar
  2. get on the mesh and see other XOs
  3. run a collaborative activity (AbiWord, Connect4, or Chat) with another XO
  4. ensure that the journal is able to resume an activity
  5. connect to an AP (and/or school mesh) and browse the web
  6. connect one XO to an AP; then boot a second XO, which should connect to a local mesh and browse the web.

(feedback on this quick list is welcome)

  • We started a discussion about a change control (ECO, Engineering Change Order) process. As we get close to ship, we should make sure that the dev teams understand the branches, check in restrictions, and we have a sign off procedure for changes.