User:LFaraone/Work/2011-W7

From OLPC
< User:LFaraone‎ | Work
Revision as of 04:58, 16 February 2011 by LFaraone (talk | contribs) (+git)
Jump to navigation Jump to search

Tasks done

  • Fix git conflicts on one.

Notes

Future tasks

  • Investigate the means by which we could import feeds a la planet.
    • We'll want to have a subset of Planet syndicated, subject to manual approval [medium, 3hr]
  • Determine a migration path for URLs on the old blog.laptop.org instance to Drupal
    • Current URL schemes are incompatible.
  • Figure out if we want to keep Wordpress for blog.l.o, and somehow integrate it with Drupal. This eliminates the above URL issue, but add new ones, namely:
    • Unify visual style. b.l.o looks decidedly un-one.l.o-like.
    • Single-user-login between Drupal and Wordpress.
  • Duplicate database for www-staging if it turns out to be needed, double check this.
  • Follow up on mailman migration with Ed et al. (talk with SJ/Adam re formulating specific rationale for upgrade)