ECO/8.1.2/Checklist

From OLPC
Jump to navigation Jump to search

Release 8.1.2

Proposal/Review

This section should be completed by the Triage team.

USR Name: OLPC 8.1.2, OFW q2e12 
USR Target date: 7/30/08
USR wiki page: OLPC_SW-ECO_6
USR Champion: Richard Smith, Kim Quirk
Proposal approved: (date and Triage team signature)
___________________________________________________

Candidate build

This section should be completed by the build master.

Build number:
Packages added/changed/removed:
(each package diff should have a trac # and/or rationale)

Test

This section should be completed by the QA lead.

Build tested:
Checklist
 Specific issue testing:            _x__ (NAND FULL test, Help activity)
 1 hour smoke test:                 _x__
 Fresh install:                     _x__  
 Upgrade testing:                   _x__  List builds tested from: 708
 Downgrade testing:                 ___  List builds tested to:
 Tested on both B4 & MP:            _MP
 Tested on multiple SKUs:           _X__  List SKUs: Spanish/English
 Tested on multiple keyboards:      _X__  List keyboards: Spanish/English
 Open, WEP, and WPA APs tested:     _X__  List brands, if appropriate: olpc, canopy
 New hardware tested, if supported: _C3 mother board
 Field testing, if possible:        ___

Release to signature/final test: (date and QA lead signature)
Kimquirk 02:56, 6 August 2008 (UTC)_________________________________________________________

Additional comments, if any:
 See Test_Group_Release_Notes for smoke test results.
 Tests/Journal/Nand-full

Signature

This section should be completed by the security team.

Build to be signed:
Keys to be used:
Security-critical components
  olpcrd version (rpm -q olpcrd):
    Signed off by/date: ________________________________________

  Firmware/OFW version (/ofw/openprom/model; check against rpm -q bootfw):
    Signed off by/date: Mitch Bradley, Wed Aug  6 05:43:43 UTC 2008

  Firmware/EC version: (/ofw/ec-name):
    Signed off by/date: ________________________________________

  Kernel version: (uname -r):
    Signed off by/date: ________________________________________

Signatures above certify that, to the best of your knowledge, the above components are at least as secure as other components signed with these keys.

This section should be completed by the build engineer.

Checklist
 Appropriate sign-offs present above:          ___
 Versions in build match those approved above: ___
 QA lead sign-off under 'Test' above:          ___
 Packages in build match those expected:       ___

Checklist sign-off: (date and build master signature)
_____________________________________________________________

Final test

This section should be completed by the QA lead on the signed image.

Build tested:
Checklist
 1 hour smoke test:                    ___ (catch signature process regressions)
 USB stick fresh install on wp laptop: ___
 USB stick upgrade on wp laptop:       ___
 Network upgrade on wp:                ___
 Other testing (describe):

Sign-off for release: (date and QA lead signature)
_____________________________________________________________

This section should be completed by the release team.

Approved build number:
OS version:
Firmware/OFW version:
Firmware/EC version:
Wireless firmware version:

Champion sign off: (date and champion signature)
_____________________________________________________________
Release team final sign off on USR: (date and release team signature)
_____________________________________________________________

Given three signatures above, the USR build can be published as official.