TestMtg, 2007-10-22

From OLPC
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Attending: Alex, Kim, Michael, Danny, Bernie, Ricardo

Test Sprint -

  1. Review of test plans on the wiki
  2. Test Activity
  3. Tinderbox
  • Michael summarized the Test Activity logging feature: purpose is to reduce the cost of testing by distributing the testing and automate the logging upload. In the short term, we should focus on getting the logging
    • Modify sugar to put a wrapper around an activity to turn on its logging. Then a crash or a user initiated activity close will zip up files and send them to a central server.
    • The central server can start off with a generic account (perhaps password-less smtp, or something). Could possibly have a local smtp server to send an email with attachment.
    • Start with a list of the system status (build version, firmware versions, maybe some of Yani's network config info)
    • Is there a lot of overlap with syslog? Bernie can probably help with getting the logs
  • The three pieces that need to work for this are:
    1. Local collection of logs
    2. Packaging of the logs for sending
    3. Reliable delivery in the face of network downtime

Things we learned from sprint:

  • Takes too long to get outside developers up to speed and contributing
    • focused documentation
    • too much overhead to get hosting for access to git repository
  • On the manual side, we also didn't have enough planning to get people going quickly:
    • Need to get on Trac
    • Need to get on mailing lists
    • Need to get on irc
    • Need to edit wiki pages

Should we have someone spend a few hours on the getting started wiki pages so that new developers or testers really can get started.

Should we hire someone to organize the community efforts; answer their questions