Deployment Guide/planning deployment needs on an individual school basis

From OLPC
< Deployment Guide
Revision as of 10:47, 21 March 2008 by Walter (talk | contribs) (New page: ==VI. Pricing worksheet (per school)== quantity unit price total cost per child laptops solar panels per classroom power strips spare power adapters multi-battery charger per school XS...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

VI. Pricing worksheet (per school)

quantity unit price total cost per child laptops solar panels

per classroom power strips spare power adapters multi-battery charger

per school XS server active antennae access points cabling power supply

connectivity modem dish/antennae/etc. physical security



startup costs installation teacher preparation shipping

recurring costs laptops for new students connectivity cost energy costs maintenance costs periodic equipment refreshes