Nepal Deployment School Server Phase 1 Design Proposal

This deployment must be online for teacher training the first week of April.
See the full schedule at: http://wiki.laptop.org/go/Nepal:Pilot_Project_Plan

The previous design discussion is maintained for tracking phase 2 at: http://wiki.laptop.org/go/Nepal:School_Server_Specification

List of Hardware

  1. Four servers
    1. XS1
    2. XS2 - Standby backup only
    3. Squid1
    4. Squid 2

All boxes will have the following: - Intel or AMD at least 2 ghz - RAM? - At least 300gb hard drive - USB ports (how many?) - DVD or CD ROM drive - 3 x Active Antennas - 10/100 NIC? - Other wireless NIC?

  1. Wireless Access Point and Router

- Model name and number?

  1. Cables

- Enough Cat 5/6 with RJ45 connectors to connect servers to Wireless AP/Router - 5 Meter USB cable for each active antenna

  1. Power strip/circuit breakers

- How many?

  1. Hub?

List of Software on XS

- - -

XS Install Scripts

- - -

XS Tests

- - -

List of Software on Squid Box

- - -


Squid Box Install Scripts

- - -

Squid Box Tests

- - -

List of Software on Library Server

- - -

Library Server Install Scripts

- - -

Library Server Tests

- - -


List of Software on XO

- - -

XO Install Scripts

- - -

XO Tests

- - -


System Level Design

- - -

Failure Cases

- - -

System Level Tests

- - -

Wireless AP/Router Config

- - -

Network Diagram

- - -