== Milestones == |
== Milestones == |
||
*Basic voltage regulator built (6/25- DONE) |
|||
=== By July 15 === |
|||
*Variable voltage regulator built (7/7) |
|||
*Have voltage regulators with current limits to 1A, 1.5A, and 2A built with circuit diagrams and cost estimates |
|||
*Design of Bicycle Generator (7/15) |
|||
=== By July 22 === |
|||
*Voltage regulator for charging multiple XOs (7/18) |
|||
*Draft deployment guide for establishing power infrastructure(calculating power requirements, needed equipment & projected costs) |
|||
*Revisit milestone schedule (7/18) |
|||
=== By August 1 === |
|||
*Testing plan for solar testing (7/18) |
|||
*Draft comprehensive guide to alternative power options |
|||
*Acquire materials for bicycle generator (7/22) |
|||
=== By August 8 === |
|||
*Draft Deployment Guide (7/25) |
|||
*Final deployment guide for establishing power infrastructure |
|||
*Bicycle Generator built (7/31) |
|||
=== By August 15 === |
|||
*Visit to Factor E Farm for testing solar setup and bicycle generator (8/1) |
|||
*Final guide to alternative power options |
|||
*Generator documentation (8/8) |
|||
*Charge several XO using a solar array at the Factor E Farm near Kansas City, MO and document findings |
|||
*Final Deployment guide (8/15) |
|||
*Final solar testing data report (8/15) |
|||
== Possible Additional Deliverables == |
== Possible Additional Deliverables == |
Revision as of 16:26, 26 June 2008
Milestones
- Basic voltage regulator built (6/25- DONE)
- Variable voltage regulator built (7/7)
- Design of Bicycle Generator (7/15)
- Voltage regulator for charging multiple XOs (7/18)
- Revisit milestone schedule (7/18)
- Testing plan for solar testing (7/18)
- Acquire materials for bicycle generator (7/22)
- Draft Deployment Guide (7/25)
- Bicycle Generator built (7/31)
- Visit to Factor E Farm for testing solar setup and bicycle generator (8/1)
- Generator documentation (8/8)
- Final Deployment guide (8/15)
- Final solar testing data report (8/15)
Possible Additional Deliverables
- Exploratory report on additional ways to store charge
- Prototype and documentation of a simple bicycle generator
- Documentation on the possibility of using a thermoelectric generator
To Do
June 13: Have a simple voltage regulator limited to 1A built for grassroots conference