ILXO/travel
< ILXO
Jump to navigation
Jump to search
thursday
- pack
- move things to maker house
- drive back to farrington - everyone sleeps there
friday
- check out of the farrington
- go to solidworks seminar, 9-12
- at this point we split into 2 groups...
- group A (Chris and Nikki)
- gets the overnight bags for all 4 of us
- gets dropped off at T/South station
- catches 2pm fung wah bus to NYC
- checks all 4 of us into Jazz Hostel Lenox
- group B (Mel and Tank)
- drops group A off at T/south station
- returns to maker house and packs Tank's car
- drives Tank's car to NYC, parking in north of Manhattan, 3976 10th av - need to estimate arrival time within 1 hour
- group A (Chris and Nikki)
- all 4 of us regroup at the open planning project offices, 349 West 12th Street #3, at 7:30pm
- continue with grassroots jam stuff as usual
saturday
- grassroots jam, no travel
- make sure mel sleeps; she'll need it for the next day
sunday
- grassroots jam in the morning
- lunch: split into 2 groups
- group A (tank chris)
- continue with jam - clean up, get feedback, etc.
- wander around nyc, have fun
- group B (mel nikki)
- catches 4pm fung wah bus back to Boston with sj
- sj will drive to ipswitch
- picks up minivan
- drives to maker house, loads minivan
- drives minivan to NYC and parks in upper manhattan
- group A (tank chris)
- all 4 of us regroup at the hostel super-late that night
monday
- leave NYC, go to Chicago (probable arrival: tuesday late night)