ECO/8.1.1/Checklist: Difference between revisions

From OLPC
< ECO‎ | 8.1.1
Jump to navigation Jump to search
Line 19: Line 19:
Build tested:
Build tested:
Checklist
Checklist
Specific issue testing: MS,___
Specific issue testing: MS,KQ,CM
1 hour smoke test: CM,MS
1 hour smoke test: CM,MS
Fresh install: KQ
Fresh install: KQ
Upgrade testing: ___ List builds tested from: 703
Upgrade testing: _%_ List builds tested from: 703
Downgrade testing: ___ List builds tested to:
Downgrade testing: ___ List builds tested to:
Tested on both B4 & MP: ___
Tested on both B4 & MP: ___
Tested on multiple SKUs: ___ List SKUs:
Tested on multiple SKUs: _$__ List SKUs:
Tested on multiple keyboards: MS List keyboards: am_ET, es_PT, en_US
Tested on multiple keyboards: MS List keyboards: am_ET, es_PT, en_US
Open, WEP, and WPA APs tested: ___ List brands, if appropriate:
Open, WEP, and WPA APs tested: ___ List brands, if appropriate:
Line 32: Line 32:
Release to signature/final test: (date and QA lead signature)
Release to signature/final test: (date and QA lead signature)
__[[User:Kimquirk|Kimquirk]] 23:44, 8 June 2008 (EDT)
_____________________________________________________________
Additional comments, if any:
Additional comments, if any:


% Upgrade testing from 656 to 708 does not retain activities.
$ SKUs tested include Ethiopia, Haiti, Mongolian, Portuguese, Spanish, Arabic

==Signature==
==Signature==
''This section should be completed by the security team.''
''This section should be completed by the security team.''

Revision as of 03:44, 9 June 2008

This page lists the sign-offs required to advance through the Unscheduled software release process. Consult that page for additional details on each step and sign-off.

Proposal/Review

This section should be completed by the Triage team.

USR Name: OLPC 8.1.1
USR Target date: week of June 7, 2008
USR wiki page: OLPC SW-ECO 5
USR Champion: Michael Stone
Proposal approved: Kim Quirk - May 15, 2008

Candidate build

This section should be completed by the build master.

Build number: update.1-708
Packages added/changed/removed:
(each package diff should have a trac # and/or rationale)

Test

This section should be completed by the QA lead.

Build tested:
Checklist
 Specific issue testing:            MS,KQ,CM
 1 hour smoke test:                 CM,MS
 Fresh install:                     KQ  
 Upgrade testing:                   _%_  List builds tested from: 703
 Downgrade testing:                 ___  List builds tested to:
 Tested on both B4 & MP:            ___
 Tested on multiple SKUs:           _$__  List SKUs:
 Tested on multiple keyboards:      MS   List keyboards: am_ET, es_PT, en_US 
 Open, WEP, and WPA APs tested:     ___  List brands, if appropriate:
 New hardware tested, if supported: n/a
 Field testing, if possible:        n/a

Release to signature/final test: (date and QA lead signature)
__Kimquirk 23:44, 8 June 2008 (EDT)

Additional comments, if any:


% Upgrade testing from 656 to 708 does not retain activities. 
$ SKUs tested include Ethiopia, Haiti, Mongolian, Portuguese, Spanish, Arabic

Signature

This section should be completed by the security team.

Build to be signed: update.1-708
Keys to be used: os and firmware signing keys
Security-critical components
  olpcrd version (rpm -q olpcrd): olpcrd-0.40-0
    Signed off by/date: Michael Stone - June 6, 2008; previously signed in official-703

  Firmware/OFW version (/ofw/openprom/model; check against rpm -q bootfw): Q2D16
    Signed off by/date: _Richard Smith 19:12, 6 June 2008 (EDT)_

  Firmware/EC version: (/ofw/ec-name): PQ2D13
    Signed off by/date: Michael Stone - June 6, 2008; previously signed in official-703

  Kernel version: (uname -r): 2.6.22-20080523.1.olpc.28f4cb6e780db07
    Signed off by/date: Deepak Saxena - June 4, 2008; (original signature)

Signatures above certify that, to the best of your knowledge, the above components are at least as secure as other components signed with these keys.

This section should be completed by the build engineer.

Checklist
 Appropriate sign-offs present above:          ___
 Versions in build match those approved above: ___
 QA lead sign-off under 'Test' above:          ___
 Packages in build match those expected:       ___

Checklist sign-off: (date and build master signature)
_____________________________________________________________

Final test

This section should be completed by the QA lead.

Build tested:
Checklist
 1 hour smoke test:                    ___ (catch signature process regressions)
 USB stick fresh install on wp laptop: ___
 USB stick upgrade on wp laptop:       ___
 Network upgrade on wp:                ___
 Other testing (describe):

Sign-off for release: (date and QA lead signature)
_____________________________________________________________

This section should be completed by the release team.

Approved build number:
OS version:
Firmware/OFW version:
Firmware/EC version:
Wireless firmware version:

Champion sign off: (date and champion signature)
_____________________________________________________________
Release team final sign off on USR: (date and release team signature)
_____________________________________________________________

Given three signatures above, the USR build can be published as official.