ECO/8.2.0/Checklist: Difference between revisions

From OLPC
< ECO‎ | 8.2.0
Jump to navigation Jump to search
Line 18: Line 18:
Checklist
Checklist
Specific issue testing: ___
Specific issue testing: ___
[[1 hour smoke test]]: ___
[[1 hour smoke test]]: ___
Fresh install: ___
Fresh install: ___
Upgrade testing: ___ List builds tested from:
Upgrade testing: ___ List builds tested from:

Revision as of 04:37, 17 September 2008

This page lists the sign-offs required to advance through the software release process. Consult that page for additional details on each step and sign-off.

Proposal/Review

This section should be completed by the Triage team.

ECO Name: ECO/8.2.0
ECO Target date: September, 2008 (slipped from August)
ECO Champion: Michael Stone
Proposal approved: (date and Triage team signature)
  March, 2008 --Michael Stone 22:16, 10 September 2008 (UTC)

Candidate build

This section should be completed by the build master.

Build number: ???

Test

This section should be completed by the QA lead.

Build tested:
Checklist
 Specific issue testing:            ___
 1 hour smoke test:                 ___
 Fresh install:                     ___  
 Upgrade testing:                   ___  List builds tested from:
 Downgrade testing:                 ___  List builds tested to:
 Tested on C2 and C3:               ___
 Tested on NiMH batteries:          ___
 Tested on en_US                    ___  *  the degree of l10n/i18n for *'d keyboards and locales 
           es_*                     ___  *  will be considered by the release team in their judgements.
           mn_MN                    ___  *  
           ht_HT                    ___  *  
           fr_RW                    ___  *  note: while there are many Spanish and Arabic locales, 
           rw_RW                    ___  *  we don't yet distinguish between them.
           am_ET                    ___  *
           ar_*                     ___
           kh_CA                    ___
           fa_AF                    ___
           hi_HI                    ___
           pt_BR                    ___
           ???                      ___
 Open, WEP, and WPA APs tested:     ___  List brands, if appropriate:
 Field testing, if possible:        ___
Release to signature/final test: (date and QA lead signature)
_____________________________________________________________

Additional comments, if any:

Signature

This section should be completed by the security team.

Build to be signed:
Keys to be used:
Security-critical components
  olpcrd version (rpm -q olpcrd):
    Signed off by/date: ________________________________________

  Firmware/OFW version (/ofw/openprom/model; check against rpm -q bootfw):
    Signed off by/date: ________________________________________

  Firmware/EC version: (/ofw/ec-name):
    Signed off by/date: ________________________________________

  Kernel version: (uname -r):
    Signed off by/date: ________________________________________

Signatures above certify that, to the best of your knowledge, the above components are at least as secure as other components signed with these keys.

This section should be completed by the build engineer.

Checklist
 Appropriate sign-offs present above:          ___
 Versions in build match those approved above: ___
 QA lead sign-off under 'Test' above:          ___
 Packages in build match those expected:       ___

Checklist sign-off: (date and build master signature)
_____________________________________________________________

Other signoffs

Upon or after announcement of the Signed Candidate:

 Documentation signoff:                ___
 Activities signoff:                   ___
 One week of testing has elapsed:      ___ 
 No untriaged bugs:                    ___ 
 No blocks:8.2.0 bugs:                 ___
 Release notes are approved:           ___

Final test

This section should be completed by the QA lead.

Build tested:
Checklist
 1 hour smoke test:                    ___ (catch signature process regressions)
 USB stick fresh install on wp laptop: ___
 USB stick upgrade on wp laptop:       ___
 Network upgrade on wp:                ___
 Other testing (describe):
Sign-off for release: (date and QA lead signature)
_____________________________________________________________

This section should be completed by the release team.

Approved build number:
OS version:
Firmware/OFW version:
Firmware/EC version:
Wireless firmware version:

Champion sign off: (date and champion signature)
_____________________________________________________________
Release team final sign off on ECO: (date and release team signature)
_____________________________________________________________

Given three signatures above, the candidate build can be published as official.