Talk:Test cases 8.2.1: Difference between revisions
Jump to navigation
Jump to search
m (New page: Things that need to go in the test plan: == Automated tests == * Not adding to this, not focusing on documenting what's going on, but tinderbox is still chugging away. == Smoke tests ==...) |
mNo edit summary |
||
Line 12: | Line 12: | ||
== Bugfix tests == |
== Bugfix tests == |
||
see non-talk page. |
see non-talk page, report 35 in trac. |
||
== Regression tests == |
== Regression tests == |
Revision as of 19:07, 23 December 2008
Things that need to go in the test plan:
Automated tests
- Not adding to this, not focusing on documenting what's going on, but tinderbox is still chugging away.
Smoke tests
- These should be run on every build released, and no further testing should be done unless these things get covered first.
- Pull them from the 8.2.0 tests, http://wiki.laptop.org/go/Test_cases_8.2.0#Smoke_Test - this is too long. Smoke tests should take <1hr for builds, but can be longer for builds we're going to test, <2hr.
Bugfix tests
see non-talk page, report 35 in trac.
Regression tests
Areas to examine?
Connectivity tests
Big Blank Gaping Hole right now.