23 Oct 2013: Design Freeze
23 Oct 2013: Design Freeze


<strike>28 Nov</strike> Target 17 December 2013: [https://docs.google.com/document/d/1o6QtzLb6e58YKWqMf_junux2XyBRLFm31un8YLcYslg Ansible migration completed and properly tested]
Nov 2013: [[XS_Community_Edition/0.5/Ansible_Progress|Ansible migration]] completed and tested.

<strike>28 Nov</strike> 17 December 2013: [http://lists.laptop.org/pipermail/server-devel/2013-December/007031.html XSCE 5.0 RC 1] was released Dec 17, 2013, formerly known as 0.5 RC 1.

[http://lists.laptop.org/pipermail/server-devel/2014-January/007148.html XSCE 5.0] released Jan 22, 2014.


Aside: overlapping v0.6 planning began around [[../Sprint#XS.28CE.29_Sprint_Part_2:_Malaysia_Culmination|Malaysia's "Culmination Sprint" 18-20 Nov 2013]].
Aside: overlapping v0.6 planning began around [[../Sprint#XS.28CE.29_Sprint_Part_2:_Malaysia_Culmination|Malaysia's "Culmination Sprint" 18-20 Nov 2013]].

Revision as of 20:20, 6 February 2014

This IIAB XSCE content does not reflect the opinion of OLPC. These pages were created by members of a volunteer community supporting OLPC and deployments.

Summary

School Server Community Edition (XSCE) is volunteer project which provides communication, networking, content, and maintenance capabilities to a school and or classroom. It is designed to be easily adopted by existing OLPC deployments or other similar education projects.

Objective

The primary objectives for XSCE version 0.5 will be migrating the existing XSCE 0.4 code base to Ansible with no regressions.

Timeline

23 Oct 2013: Design Freeze

Nov 2013: Ansible migration completed and tested.

28 Nov 17 December 2013: XSCE 5.0 RC 1 was released Dec 17, 2013, formerly known as 0.5 RC 1.

XSCE 5.0 released Jan 22, 2014.

Aside: overlapping v0.6 planning began around Malaysia's "Culmination Sprint" 18-20 Nov 2013.