*Final guide to alternative power options |
*Final guide to alternative power options |
||
*Charge several XO using a solar array at the Factor E Farm near Kansas City, MO and document |
*Charge several XO using a solar array at the Factor E Farm near Kansas City, MO and document findings |
||
== Possible Additional Deliverables == |
== Possible Additional Deliverables == |
Revision as of 02:15, 7 June 2008
Milestones
By July 15
- Have voltage regulators with current limits to 1A, 1.5A, and 2A built with circuit diagrams and cost estimates
By July 22
- Draft deployment guide for establishing power infrastructure(calculating power requirements, needed equipment & projected costs)
By August 1
- Draft comprehensive guide to alternative power options
By August 8
- Final deployment guide for establishing power infrastructure
By August 15
- Final guide to alternative power options
- Charge several XO using a solar array at the Factor E Farm near Kansas City, MO and document findings
Possible Additional Deliverables
- Exploratory report on additional ways to store charge
- Prototype and documentation of a simple bicycle generator
- Documentation on the possibility of using a thermoelectric generator
To Do
June 13: Have a simple voltage regulator limited to 1A built for grassroots conference