Deployment Guide/planning deployment needs on an individual school basis: Difference between revisions
Jump to navigation
Jump to search
m (cat) |
(See Talk:Deployment_Guide for rationale) |
||
Line 125: | Line 125: | ||
|} |
|} |
||
==Next Section: [[Deployment Guide/imaging, activating, and registering laptops|Guide to imaging, activating, and registering laptops]]== |
|||
[[Category:Documentation]] |
[[Category:Documentation]] |
Revision as of 01:04, 27 March 2008
VI. Pricing worksheet (per school)
item | quantity | unit price | total cost |
---|---|---|---|
per child | |||
laptops | 1 | ||
solar panels | |||
per classroom | |||
power strips | |||
spare power adapters | |||
multi-battery charger | |||
per school | |||
XS server | 1 | ||
active antennae | |||
access points | |||
cabling | |||
power supply | |||
physical security | |||
connectivity | |||
modem | |||
dish/antennae/etc. | |||
startup costs | |||
installation | |||
teacher preparation | |||
shipping | |||
recurring costs | |||
laptops for new students | |||
connectivity cost | |||
energy costs | |||
maintenance costs | |||
periodic equipment refreshes |