Tests: Difference between revisions
No edit summary |
|||
Line 35: | Line 35: | ||
=== Mime Types === |
=== Mime Types === |
||
[[What should go into Mime Type tests]] |
[[What should go into Mime Type tests]] |
||
===Battery Life=== |
|||
Base line test for battery life. Boot up the machines, fully charge, remove the adapters and see how long the battery lasts. |
|||
[[Image:Baseline_battery_test.pdf | Battery Life Test 1 Results]] <br> |
|||
[[Battery Results]] |
|||
=== Regular processes === |
=== Regular processes === |
Revision as of 00:05, 15 January 2008
These are tests for the builds, materials on them, networks, school servers, and any global synchronization. There is a Test activity being designed to make testing on an XO simple, and independent of the details of the backend that tracks test results.
User Stories Testing
User Stories are meant to provide a narrative description of how the OLPC products will be used in schools and homes. These stories provide the basis for Use Case or System Tests that will help ensure we have prioritized and documented the most important uses of our products in the field.
High level topics for User Stories can be divided into a few major categories:
One Hour Smoke Test
Networks
Views and visualizations
Tests | Results | |
---|---|---|
Tests/Mesh view | Results/Mesh view | |
Tests/Neighborhood view | Results/Neighborhood view |
Mime Types
What should go into Mime Type tests
Battery Life
Base line test for battery life. Boot up the machines, fully charge, remove the adapters and see how long the battery lasts.
File:Baseline battery test.pdf
Battery Results
Regular processes
- Tests/Start up and Activation
- Test Basic Operation
- Tests/Connectivity and Collaboration
- Tests/Archive, Backup, Content
- Tests/Invite
International Laptops
Upgrading
Hardware and firmware
- Tests/SD card
- Tests/SD card acting as a usb drive in card reader
- Tests/USB stick
- Tests/Manufacturing Data
SchoolServer
- See also
- Category:Test Plans