Tests: Difference between revisions

From OLPC
Jump to navigation Jump to search
No edit summary
Line 39: Line 39:


# [[Tests/Start up and Activation]]
# [[Tests/Start up and Activation]]
# [[Test Basic Operation]]
# [[Tests/Connectivity and Collaboration]]
# [[Tests/Connectivity and Collaboration]]
# [[Tests/Archive, Backup, Content]]
# [[Tests/Archive, Backup, Content]]
Line 44: Line 45:


=== International Laptops ===
=== International Laptops ===
# [[Test Basic Operation]]
# [[Test Keyboard mappings]]
# [[Test Keyboard mappings]]



Revision as of 16:10, 9 January 2008

Merge-arrows.gif
It has been suggested that this article or section be merged with Test issues. (Discuss)


These are tests for the builds, materials on them, networks, school servers, and any global synchronization. There is a Test activity being designed to make testing on an XO simple, and independent of the details of the backend that tracks test results.

User Stories Testing

User Stories are meant to provide a narrative description of how the OLPC products will be used in schools and homes. These stories provide the basis for Use Case or System Tests that will help ensure we have prioritized and documented the most important uses of our products in the field.

High level topics for User Stories can be divided into a few major categories:


One Hour Smoke Test


Networks

  1. Tests/100 laptops

Views and visualizations

Tests Results
Tests/Mesh view Results/Mesh view
Tests/Neighborhood view Results/Neighborhood view


Mime Types

What should go into Mime Type tests

Regular processes

  1. Tests/Start up and Activation
  2. Test Basic Operation
  3. Tests/Connectivity and Collaboration
  4. Tests/Archive, Backup, Content
  5. Tests/Invite

International Laptops

  1. Test Keyboard mappings

Upgrading

  1. From last stable build

Hardware and firmware

  1. Tests/SD card
  2. Tests/SD card acting as a usb drive in card reader
  3. Tests/USB stick
  4. Tests/Manufacturing Data

SchoolServer

See also
Category:Test Plans