Deployment Guide

From OLPC
Jump to navigation Jump to search
  This page is monitored by the OLPC team.

One Laptop per Child (OLPC) Deployment Guide

(DRAFT—please make suggestions for major revisions on the discussion page; feel free to make minor corrections/additions in-line.)

The OLPC Deployment Team: Walter Bender, David Cavallo, Carla Gomez Monroy, Edgar Ceballos

This is a generalized guide to a large-scale deployment of one laptop per child. It is a working document that reflects lessons learned from our initial pilots and deployments. Additional ideas will be incorporated as we learn from each other.

Every deployment includes planning (pre-deployment), execution (deployment), and support (post-deployment). Topics that need to be considered in detail in any deployment include:

  1. Core Team
  2. Logistics
  3. Localization
  4. Connectivity
  5. Power Infrastructure
  6. School Server
  7. Teacher Preparation/Student Facilitation
  8. Support
  9. Service/Repairs

Each of these topics is expanded upon in this wiki. Also in the wiki are: (I) some tips based upon our experience in trial deployments around the world; (II) a deployment checklist; (III) a sample deployment deployment schedule; (IV) a sample workshop schedule; (V) a glossary of terms; (VI) a worksheet for planning deployment needs on an individual school basis; and (VII) a guide to imaging, activating, and registering laptops.