Deployment Guide: Difference between revisions

From OLPC
Jump to navigation Jump to search
m (Reverted edits by 90.204.70.9 (Talk); changed back to last version by Cjl)
Line 21: Line 21:
# [[Deployment Guide/Support|Support]]
# [[Deployment Guide/Support|Support]]
# [[Deployment Guide/Service Repairs|Service/Repairs]]
# [[Deployment Guide/Service Repairs|Service/Repairs]]
# [[Deployment Guide/Internet Safety training|Internet Safety Training]]
# [[Deployment Guide/End of life planning|End of life planning]]



Each of these topics is expanded upon in this wiki. Also in the wiki are: (I) some [[Deployment Guide/tips|tips]] based upon our experience in trial deployments around the world; (II) a deployment [[Deployment Guide/checklist|checklist]]; (III) a sample deployment [[Deployment Guide/deployment schedule|deployment schedule]]; (IV) a sample [[Deployment Guide/workshop schedule|workshop schedule]]; (V) a [[Deployment Guide/Glossary|glossary]] of terms; (VI) a worksheet for [[Deployment Guide/planning deployment needs on an individual school basis|planning deployment needs on an individual school basis]]; and (VII) a guide to [[Deployment Guide/imaging, activating, and registering laptops|imaging, activating, and registering laptops]].
Each of these topics is expanded upon in this wiki. Also in the wiki are: (I) some [[Deployment Guide/tips|tips]] based upon our experience in trial deployments around the world; (II) a deployment [[Deployment Guide/checklist|checklist]]; (III) a sample deployment [[Deployment Guide/deployment schedule|deployment schedule]]; (IV) a sample [[Deployment Guide/workshop schedule|workshop schedule]]; (V) a [[Deployment Guide/Glossary|glossary]] of terms; (VI) a worksheet for [[Deployment Guide/planning deployment needs on an individual school basis|planning deployment needs on an individual school basis]]; and (VII) a guide to [[Deployment Guide/imaging, activating, and registering laptops|imaging, activating, and registering laptops]].

Revision as of 08:39, 6 July 2008

  This page is monitored by the OLPC team.
  english | español HowTo [ID# 143031]  +/-  

Translate this page with Google -español -български -中文(中国大陆) -中文(臺灣) -hrvatski -čeština -dansk -Nederlands -suomi -français -Deutsch -Ελληνικά -हिन्दी -italiano -日本語 -한국어 -norsk -polski -português -română -русский -svenska


One Laptop per Child (OLPC) Deployment Guide

Pencil.png NOTE: The contents of this page are not set in stone, and are subject to change!

This page is a draft in active flux ...
Please leave suggestions on the talk page.

Pencil.png

Feel free to make minor corrections/additions in-line.

The OLPC Deployment Team: David Cavallo, Carla Gomez Monroy, Edgar Ceballos

This is a generalized guide to a large-scale deployment of one laptop per child. It is a working document that reflects lessons learned from our initial pilots and deployments. Additional ideas will be incorporated as we learn from each other.

Every deployment includes planning (pre-deployment), execution (deployment), and support (post-deployment). Topics that need to be considered in detail in any deployment include:

  1. Core Team
  2. Logistics
  3. Localization
  4. Connectivity
  5. Power Infrastructure
  6. School Server
  7. Teacher Preparation/Student Facilitation
  8. Support
  9. Service/Repairs
  10. Internet Safety Training
  11. End of life planning


Each of these topics is expanded upon in this wiki. Also in the wiki are: (I) some tips based upon our experience in trial deployments around the world; (II) a deployment checklist; (III) a sample deployment deployment schedule; (IV) a sample workshop schedule; (V) a glossary of terms; (VI) a worksheet for planning deployment needs on an individual school basis; and (VII) a guide to imaging, activating, and registering laptops.

Next Section: Core Team