Deployment Guide: Difference between revisions
(add GoogleTrans-en) |
|||
Line 1: | Line 1: | ||
{{OLPC}} |
{{OLPC}} |
||
{{translations}} |
{{translations}} |
||
<noinclude>{{ GoogleTrans-en | es =show | bg =show | zh-CN =show | zh-TW =show | hr =show | cs =show | da =show | nl =show | fi =show | fr =show | de =show | el =show | hi =show | it =show | ja =show | ko =show | no =show | pl =show | pt =show | ro =show | ru =show | sv =show }}</noinclude> |
|||
==One Laptop per Child (OLPC) Deployment Guide== |
==One Laptop per Child (OLPC) Deployment Guide== |
||
{{draft}} |
{{draft}} |
Revision as of 20:09, 31 May 2008
Translate this page with Google -español -български -中文(中国大陆) -中文(臺灣) -hrvatski -čeština -dansk -Nederlands -suomi -français -Deutsch -Ελληνικά -हिन्दी -italiano -日本語 -한국어 -norsk -polski -português -română -русский -svenska
One Laptop per Child (OLPC) Deployment Guide
NOTE: The contents of this page are not set in stone, and are subject to change! This page is a draft in active flux ... |
Feel free to make minor corrections/additions in-line.
The OLPC Deployment Team: David Cavallo, Carla Gomez Monroy, Edgar Ceballos
This is a generalized guide to a large-scale deployment of one laptop per child. It is a working document that reflects lessons learned from our initial pilots and deployments. Additional ideas will be incorporated as we learn from each other.
Every deployment includes planning (pre-deployment), execution (deployment), and support (post-deployment). Topics that need to be considered in detail in any deployment include:
- Core Team
- Logistics
- Localization
- Connectivity
- Power Infrastructure
- School Server
- Teacher Preparation/Student Facilitation
- Support
- Service/Repairs
Each of these topics is expanded upon in this wiki. Also in the wiki are: (I) some tips based upon our experience in trial deployments around the world; (II) a deployment checklist; (III) a sample deployment deployment schedule; (IV) a sample workshop schedule; (V) a glossary of terms; (VI) a worksheet for planning deployment needs on an individual school basis; and (VII) a guide to imaging, activating, and registering laptops.